This is complete list of kharif vegetables growing in Pakistan with sowing date, transplantation date, fertilizers requirements and harvesting time.
AGRONOMIC PACKAGES OF KHARIF VEGETABLES
Sr. No.
Name of vegetable
Sowing time
Transpla- nting Time.
Seed rate
(Kg)
Spacing
FYM Tons
Fertilizer
Delta of water
Marketing
R x R
P x P
N
P
K
1.
Watermelon
Feb-March
June-July
–
–
1.0
1.0
Both sides 3m.beds
50 cm
“
10-15
“
*25
**25
27
0
0
0
30
“
May – June
Sept. – Oct.
2
Muskmelon
Feb-March
June-July
–
–
1.5
1.5
Both sides 2.5m.beds
45 cm
“
10-15
“
*25
**25
27
0
25
0
30
“
May – June
Sept. – Oct.
3
Bitter gourd
March – April
June – July
–
–
3.5
3.5
Both sides 2.5m.beds
30 cm
“
10-15
“
*16
**16
27
0
0
0
30
“
May – June
Aug.–Oct.
4
Bottle gourd
Feb. – March
June – July
October
–
–
–
2.0
2.0
2.0
Both sides 2.5m.beds
Both sides 3.0m.beds
Both sides 2.5m.beds
60 cm
70 cm
70 cm
10-15
“
“
*16
**16
-do-
-do-
27
0
-do-
-do-
0
0
-do-
-do-
30
“
“
May – June
Aug.–Oct.
March – May
5
Vegetabe Marrow
Jan. – Feb.
November
–
–
2.0
2.0
Both sides 1.5m.beds
Both sdes 1.5m.beds
Both sides
45 cm
45cm
10-15
“
*16
**16
-do-
27
0
-do-
0
0
-do-
30
“
April
March
6
Sponge gourd
Marc – April
June – July
–
–
1.5
“
Both sides 3 m.beds
-do-
70 cm
“
10-15
“
*16
**16
-do-
27
0
-do-
0
0
-do-
30
“
June – Aug.
Aug. – Oct.
7.
Long Melon
Feb.- March
–
1.0
-do-
30 cm
10-15
*16
**16
27
0
0
0
30
30
April-May
8.
Cucumber
Feb.- March
–
1.0-1.5
Both sides 2.5m beds
30 cm
10-15
*16
**16
27
0
0
0
30
30
April-May
9
Tinda gourd
March –April
June- July
–
–
1.5
–
Both sides 2 m beds
-DO-
45 cm
“
10-15
“
*16
**16
“
27
0
“
0
0
“
30
30
April-June
Aug. –Oct.
10
Okra
Feb. – March
June- July
–
–
10.0
8.0
Both side 75 cm Ridges
-do-
20 cm
“
10-15
“
*16
**16
“
27
0
“
0
0
“
21
-do-
April-May
Sep.- Oct.
11
Chillies
Oct.- Nov.
February
Feb.
April
0.5
-do-
75 cm
“
45 cm
“
15-20
“
*25
**25
“
27
0
“
25
0
“
54
“
May – Sep.
June- Nov.
12
Brinjal
Nov.
Feb.
200-250gm
1 m
50 cm
12-15
*25
**25
27
0
0
0
42
April-June
Feb.
April
“
“
“
“
“
“
“
“
June-Sep
June
Aug.
“
“
“
“
“
“
“
“
Sep. –Dec.
13
Turmeric
March- April
–
600-700kg
50 cm
20 cm
20-25
*26
**26
27
0
0
0
72
Feb. – April
14
Arum
Feb. – March
–
800-900kg
60 cm
15 cm
20-25
*26
**26
36
0
0
0
60
Aug.
15
Sweet Potato
Feb.- march
–
14000 cutting
Both sides 1 m beds
30 cm
–
*9
23
0
36
July –Aug.
June –July
–
“
“
“
“
“
“
“
“
Nov. Dec.
* Before sowing
** After one month